|
Main work history of Pajoohesh Consulting Engineers is
summarized to three following groups: (Click
on each item to view list of projects)
Group One
Design and construction supervision of buildings and
infra-structures:
Metro Stations
• Tehran metro line 1, Mosala station (P1)
• Tehran metro line 1, Shosh station (E1)
• Tehran metro line 1, Javanmard-e-ghasab station (A1)
• Tehran metro line 1, Shahr-ray station (A1-1)
• Tehran metro line 1, Haram-e-motahar station (A1-6)
• Tehran metro line 2, Navab station (I2)
• Tehran metro line 2, Midan-e-hor station (J2)
• Tehran metro line 2, Structure of Midan-e-emam Hussein
station (Q2)
• Tehran metro line 4, College station (I4)
• Tehran metro line 5, (Tehran-Karaj electric train),
Chitgar station
• Tehran metro line 5, (Tehran-Karaj electric train), Iran-khodro
station
• Tehran metro line 5, (Tehran-Karaj electric train),
Vardavard station
• Tehran metro line 5, (Tehran-Karaj electric train),
Garmdarreh station
• Tehran metro line 5, (Tehran-Karaj electric train),
Atmosfer station
• Tehran metro line 5, (Tehran-Karaj electric train), Karaj
station
• Tehran metro line 5, Mardabad station
• Tehran metro line 7, Navab/Ghazvin Station (N7)
• Tehran metro line 7, Navab/Komeil station (O7)
• Tehran metro line 7, Navab/Imam Khomeini Station (P7)
• Tehran metro line 7, Midan-e-Sanat station (W7)
• Shiraz LRT line 1, Mirza-ye-shirazi station
• Shiraz LRT line 1, Chamran station
• Shiraz LRT line 1, Emam Hossein Station
• Shiraz LRT line 1, Fazilat Station
Metro Systems
• Tehran metro line 7, Basic design for total civil works
• Tabriz LRT line 2, Civil work and financial studies
Other Metro Installations
• Tehran metro - Underground Sub-station (63/20KV),
Ghorkhaneh
• Tehran metro - Terminal installation, Mehrshahr
• Tehran metro - Uneven crossings, south of line1
• Tehran metro - Ground level side walls, south of line1
• Tehran metro - (A1-12) service complex, south of line1
Sports Halls
• Sports complex for 30,000 spectators, Kerman
• Sports complex for 15,000 spectators, Orumieh
• Sports complex for 15,000 spectators, Gorgan
• Sports complex for 15,000 spectators, Sabzevar
• Sports complex for 10,000 spectators, Tehran
• Sports complex for 10,000 spectators, Rafsanjan
• Sports complex for 10,000 spectators, Shahr-e Babak
Railway Projects
• Railway stations and technical buildings, from Maragheh to Oromieh
• Railway stations and technical buildings, from Shiraz to Asalouyeh
Heavy Industrial Structures
• 50,000 tons Silo-north of Khozestan, Shosh
• Silo redevelopments: Sanandaj, Saghez, Khoi, Mahabad,
Ghochan and
Borazjan
Other Buildings
• Miscellaneous residential and industrial buildings in
Tehran and other cities
Group Two
Construction management, lead and management of
sub-contractors and consultants for projects where coordinating
between design and construction is needed:
Tehran metro line 1 - southern section
• Station B1 to south of station A1-6
• Total 13 Km long route
• With 5 stations and related services/technical projects
Tehran metro line 2
• Station E2 to station X2
• Total 19Km long route
• With 19 stations and related services/technical projects
Tehran metro line 5 (Tehran-Karaj electric train)
• Station E2 to Golshahr station
• Total 39Km long route
• With 10 stations and related services/technical projects
Tehran metro services/technical buildings, includes:
• Metro control center
• West terminal
• Ghorkhaneh Sub-station (63/20KV)
• Underground mid-tunnel extraction units
Group Three
Project Management:
Project management for Tehran metro line 1 - north extension
(construction operation)
• From Mirdamad station (Haghani) to Midan-e Tajrish
• Total 8 Km long route
• Includes 7 stations, one (63/20KV) sub-station and other
related installations.
Project management for Tehran metro line 3 (construction
operation)
• From northeast of Tehran (Ozgol) to southwest of Tehran
(boarder of Tehran
district area 18)
• Total of 35 Km long route
• Includes 30 stations, 3 sub-stations (63/20KV), terminal &
workshops,
parking area and uneven crossings.
Project management for Mashhad rail system (lines 2 and 3)
The cooperation of "Pajoohesh Consulting Engineers" and
"SYSTRA"
(a well-known French company) is responsible for this
project.
(SYSTRA's web site:
www.systra.com )
|